Efficiency is mandatory in 2026
The law has been called GModG since 29 July 2026; section 71 has been repealed. Section 15 limits a new home's annual primary energy demand to 0.55 times the reference building. For heating, section 10 refers to sections 42–45. Gas and oil systems remain possible under the legal conditions, but buildings using them remain excluded from KfW 297/298 funding.
KFN 297 for private owner-occupiers and 298 for other applicants both include EH55, EH40 with LCA and EH40 with QNG. EH55 has been eligible again since 16 December 2025 and requires valid planning permission. EH55 and EH40 with LCA offer up to €100,000 per dwelling, or up to €150,000 with QNG. QNG is a level, not a separate programme. There is no grant towards repayment.
Three elements of modern home energy
Air-to-water heat pumps cost €18,000–€32,000 including buffer storage. An 8–14 kWp PV system with 8–14 kWh storage raises self-consumption to 65–80%; total investment is €18,000–€35,000.
The building envelope—insulation, Uw below 0.9, airtightness and heat-recovery ventilation—is the largest lever. Factory production gives prefabricated construction a precision advantage.
What pays in 2026
For many households the strongest package is Efficiency House 40, heat pump, 10–12 kWp PV, 10 kWh storage and controlled ventilation. Added cost is €28,000–€45,000, with funding covering 30–40%.
Direct electric heating, ventilation without heat recovery and oversized storage are less attractive. Prepare the electrical board for a wallbox, but do not oversize a battery for a future car.