Skip to content
Home›Costs & funding›Finance

KfW funding 2026: current programmes for new homes

KfW 297 is for private owner-occupiers and 298 for other applicants. EH55 or EH40 with LCA: up to €100,000 per dwelling; QNG: up to €150,000. No repayment grant.

fertig-haus.net editorial team
Updated: 20 October 2026
Reading time: 5 min
EH55 remains eligible · updated 20 October 2026

KfW funding 2026: up to €100,000 per dwelling, up to €150,000 with QNG

  • Free and without obligation
  • Reply within 24 hours
Step 1 of 4 · about 20 seconds left

What type of house are you planning?

Energy standardLoan per dwellingRate from
EH55 · valid planning permission requiredup to €100,000from 1.00% (10 yr)
EH40 with LCAup to €100,000from 1.94% (10 yr)
EH40 with QNGup to €150,000from 1.94% (10 yr)
  • As of 09 October 2026 · nominal / effective; KfW fixes rates at approval.
  • EH55, 10 years: 1.00% / 1.00%.
  • EH40/QNG, 10 years: 1.94% / 1.96%.
  • EH40/QNG, 25 years: 2.81% / 2.85%.
  • EH40/QNG, 35 years: 2.94% / 2.98%.

The Kreditanstalt für Wiederaufbau (KfW) funding landscape is the most important financing instrument for energy-efficient new-build prefabricated homes in 2026. Two programs dominate: the federal Climate-Friendly New Residential Buildings programmes (KfW 297 and 298) and, as an alternative, the Home Ownership for Families program (WEF, KfW 300). Both provide reduced-interest loans with fixed rates for up to ten years and initial repayment-free years.

€150,000
KFN 297/298 with QNG
per dwelling
€100,000
KFN 297/298 without QNG
EH55 or EH40 with LCA
€170,000–€270,000
WEF 300 for families
EH40 with LCA; children and QNG determine the limit

KfW funding programs for 2026 at a glance

In brief: KfW itself is the primary source for all current terms. The Federal Ministry for Housing, Urban Development and Building also explains the program structure, application process and eligible measures in its federal Climate-Friendly New Construction funding section. Programme 297 is for private owner-occupiers; 298 is for all other applicants, including landlords and companies. Both offer EH55, EH40 with life-cycle assessment (LCA), and EH40 with QNG.

The highest loan level in both programmes requires the Quality Seal for Sustainable Buildings (QNG) . QNG is not a separate programme. EH55 has been eligible again since 16 December 2025 and requires valid planning permission; its 2025/26 budget is €800 million. There is no repayment grant.

Application process and energy-efficiency expert

  • Choose an energy-efficiency expert from the official list and have them prepare the Confirmation for Application (BzA).
  • Apply through your bank before construction; planning and advice are permitted beforehand.
  • After completion, have the same expert submit the Confirmation after Completion (BnD).
  • Supply and service contracts may be signed beforehand with a suspensive or resolutory condition tied to funding approval.

The responsible professional must be listed in the nationwide federal Energy Efficiency Experts List maintained by dena — otherwise KfW will reject the application. Brand-name providers generally employ listed experts or work with independent specialists; ask for written confirmation of the list entry.

Common pitfall: application order

Apply before construction starts. Planning, advice, and supply or service contracts with a suspensive or resolutory condition tied to funding approval are allowed beforehand. Have the contract wording and application timing checked in advance.

Combining KFN, WEF, BEG and state programs

Some federal programs can be combined, while others cannot. KFN (297/298) and WEF (300) are not intended to be combined; KfW permits WEF 300 to be combined with loan 124. BEG support for existing building renovations is not relevant to new construction. State development banks such as L-Bank Baden-Württemberg, BayernLabo and NRW.Bank offer their own programmes; check eligibility and combinations with the relevant lender. The Efficiency House framework in the 2026 GEG guide determines which level your home must achieve.

Request a funding-eligible prefabricated home at a fixed price

Brand-name providers in our comparison of 35 manufacturers supply EH 40 and QNG-compliant homes, including an energy-efficiency expert. We bundle your request so that the funding amount and equity requirement are shown transparently.

Ready for the next step?

Use our network of reviewed providers to receive free quotes matched to your requirements.

Compare quotes now

Frequently asked questions

The most common questions about KfW funding 2026, answered concisely by the fertig-haus.net editorial team (updated 2026).

Which KfW funding is available for prefabricated houses in 2026?
297 is for private owner-occupiers, 298 for other applicants. Both offer EH55 and EH40 with LCA up to €100,000 per dwelling, or EH40 with QNG up to €150,000. QNG is a level, not a separate programme. EH55 has been eligible again since 16 December 2025, requires valid planning permission and has a €800 million budget for 2025/26. There is no repayment grant.
When must I apply?
Apply through your bank before construction. Planning, advice and supply/service contracts with a suspensive or resolutory condition tied to funding approval are permitted beforehand.
Can state funding be combined with KfW?
Many state programmes can be combined with KfW. Amounts and eligibility vary, so obtain project-specific advice before committing.
How does WEF 300 work?
WEF offers €170,000–€270,000 depending on children and QNG, with EH40 and LCA required. It may be combined with loan 124, but not with 297/298.
Is heating support available for a new prefabricated house?
KfW 458 heating support is for existing buildings only, not new construction.